WebAdmin

About Web Admin

This author has not yet filled in any details.
So far Web Admin has created 281 blog entries.

Graduation Project Student List

2024-02-11T12:54:29+00:00

Civil Engineering Department Announces "Student List Project"  and " Thesis Writing Guidelines " for academic year ( 2016- 2017 ) in linked bellow.   Graduation Project Student List Thesis Writing Guidelines 2016-2017  

Graduation Project Student List2024-02-11T12:54:29+00:00

Computer Application Web page For Academic Year 2016-2017

2024-02-11T12:50:40+00:00

Announcement for Forth Grade who registered the computer Application program (BIM ) , you can follow this link bellow daily to get lectures note and More Announcements about your course . Computer  Application Web page: www.engineering.tiu.edu.iq/civil/bim/

Computer Application Web page For Academic Year 2016-20172024-02-11T12:50:40+00:00

Graduation Project

2024-02-11T12:51:28+00:00

  civil engineering department announcing the graduation project for new academic year (2016-2017) under these Regulations : 1. Group consists three to four students. 2. Group average GPA is considered. 3. Application form is filled and submit to Mr. Mohammad Tareq (Room No. 310). 4. Dead line to submit the application form is Wednesday (October 26, 2016).   *Note: Each student must write down his/ her GPA in front of his /her name with signature *Note: filling form should be written clearly with blue pen. *Links: For Graduation Project Requesting forms        Click Here For Graduation Project List   Click [...]

Graduation Project2024-02-11T12:51:28+00:00

Graduation Project Request Form

2016-11-23T12:04:24+00:00

[toggle title="Graduation Project Request Form" state="close"] Graduation Project Request Form Click Here To Download  [/toggle]

Graduation Project Request Form2016-11-23T12:04:24+00:00

Weekly schedule

2024-02-11T12:52:13+00:00

Announcement for Civil Engineering students that 16th of Oct. (Sunday) is the firs day of starting new academic year of 2016-2017, you may see your weekly schedule in student access or in liked bellow:- Weekly Schedule Fall Semester  [facebook]  

Weekly schedule2024-02-11T12:52:13+00:00

Tishk International Hosting Accreditation Seminar

2017-06-06T12:35:33+00:00

Tishk International University’s Academic and ZEvA Agency’s Delegate held a seminar concerning the international accreditation issues at 18.30 on October 04, 2016. The interest in the program was so high. The Erbil Governor, the representatives of the Ministry of Higher Education and Scientific Research and the other Ministries, Presidents of the KRG Universities, Deans of Colleges, Heads of Departments, Lecturers, and Academics were ready. The program started with the inauguration speech by President Prof. Dr. Ahmet Öztaş. Seeing the accreditation as crucial in integration to the world, Erbil’s Governor Dr. Newzad Hadi expressed his gratitude in his speech. On behalf of the Ministry, Dr. [...]

Tishk International Hosting Accreditation Seminar2017-06-06T12:35:33+00:00

2016-11-28T07:34:48+00:00

This Compression Testing Machine is a hydraulic, electrically operated unit, designed for conducting compression tests on concrete specimens up to 20 cm. Diameter (or width and depth) and 30 cm, in height and also rocks and various other materials. Cold Crushing Strength (CCS) test is also possible in this Compression Testing Machine. The Compression Testing Machine consists of a steel cross head and cast iron base with two pillars connecting the base and cross head by means of nuts. The hydraulic jack of this Electric Compression Tester is fixed to the base. The upper platen has got a self aligning action [...]

2016-11-28T07:34:48+00:00

2016-11-28T07:34:48+00:00

The apparatus consists of two conical hoppers having a hinged trap door attached to the lower end of each hopper, allowing the concrete sample to flow freely into the cylindrical mould. The hoppers and the mould are mounted onto a rigid steel frame and are easily removable for cleaning. The complete apparatus is prCompaction factor Machineotected against corrosion. Weight approx.: 50 kg

2016-11-28T07:34:48+00:00

Sieve Set Details

2016-11-28T07:34:48+00:00

[toggle title="Sieve Set Details " state="open"] Red Set Black Set Sieve No. Mesh Size No. Sieve No. Mesh Size No. 200 75 mic   230     100 150 mic   200 75 mic 2 40 0.2425 mm   120   30 0.6 mm   100 150 mic   16 1.8 mm   60   10 2 mm   50   4 4.75 mm 2 35   3/4 19 mm   30 0.6 mm 2 1 25 mm   18   1    1/2 37.5 mm   16 1.8 mm 2 2 50 mm   10 2 mm   2    1/2 63 mm [...]

Sieve Set Details2016-11-28T07:34:48+00:00

Make Up Schedule

2024-02-11T13:07:45+00:00

The make up schedule have been updated in 31 of Aug. 2016 by student's suggestion .    

Make Up Schedule2024-02-11T13:07:45+00:00
Go to Top